Cheung, E, Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(01), 7–20.

Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(01), 61–78.

  • Type: Journal Article
  • Keywords: Financial analysis; Finland; Project finance; Project management; Roads
  • ISBN/ISSN: 1366-4387
  • URL: https://doi.org/10.1108/13664380910942644
  • Abstract:

     Purpose: A project delivery system (PDS) refers to the organizational framework of a project that defines the control mechanisms and the relationships between actors and their incentives. It is of major importance to the project owner as it, for instance, contributes to the project’s level of efficiency. This paper aims to define indicative, relative cost performances of different PDSs in a road management context to support the road owner’s strategy development. Design/methodology/approach: This study compares the costs of design-bid-build, construction management at-fee, design-build, design-build-operate and design-build-finance-operate based on an international data capture focusing on the operational performance of these PDSs. A financial analysis was made to determine the systems’ present costs to a road authority based on relevant market estimates. Moreover, a step towards understanding their overall efficiency was taken by focusing also on differences in speed of delivery which result in expenses or savings to the user community. Findings: Although the applicability of a PDS depends on project properties and constraints, the study concludes that, in general, the broader the scope of services supplied by a single contract, the lower the system’s present cost to the owner. The inclusion of private finance and early commissioning advantage, however, change the ranking so that universal conclusions cannot be drawn. DBFO seems to be commonly in the middle category. Research limitations/implications: Here, PDSs are applied to a relatively large project, minimum size €30-60m, in well-known conditions and involving no factors of uncertainty due to third parties. The results are not valid in smaller and/or more constrained projects. Originality/value: The study provided new knowledge of the owner’s and society’s average comparable cost performances in the case of five different PDSs. Since a single-value, exclusive solution hardly exists, the study on the sensitivity of different PDSs to key financial parameters is also valuable.

Matipa, W M, Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(01), 79–89.

Owusu, M D and Badu, E (2009) Determinants of contractors' capital investment finance strategy in Ghana. Journal of Financial Management of Property and Construction, 14(01), 21–33.

Singh, L B and Kalidindi, S N (2009) Criteria influencing debt financing of Indian PPP road projects: a case study. Journal of Financial Management of Property and Construction, 14(01), 34–60.